Why Us
Why facilities pick us
- Complete strip to bare floor—no slurry residues
- Neutralize/rinse to correct pH before finish
- 3–5 coats high-solids finish; edges & corners detailed
- Consistent crews + Supervisor audits and access controls
Outcomes
Typical results
24–48
Proposal
turnaround
turnaround
90–100
Finish removal
success
success
4–12
Cure time
to light use
to light use
Fit
Floors we support
VCT/LVT, sheet vinyl, sealed terrazzo (select), acrylic-finished floors in corridors, classrooms, retail, and healthcare admin areas.
Deliverables
Scope of work
- Post signage; mask sensitive edges & thresholds
- Chemical strip with dwell/agitation; slurry recovery
- Neutralize & triple-rinse to target pH
- Apply 3–5 coats high-solids finish (per spec)
- Edge & corner detail; baseboard tidy
- Final cure window + re-open guidance
Exclusions: asbestos-containing tiles (pre-1990s VAT), loose/delaminated flooring repair, subfloor levelling, stone/concrete polishing. We test for finish compatibility in a small area first.
Compliance
Protocols & safety
- WHMIS-aligned; SDS on site; PPE; ventilation & runoff control
- Slip-safety: cones/signage; egress kept clear
- Auto-scrubbers/wet vacs for slurry capture
- WSIB coverage & liability insurance (certificates)
- Finish cure times respected before re-open
We coordinate with facilities to stage zones and minimize downtime.
Scheduling
Scheduling & frequency
- After-hours or weekend windows
- Annual or semi-annual cycles; interim burnish programs
- Emergency restoration for inspections/events
- Rotation by traffic zones (entries vs corridors)
Method
Program flow
- 1Walkthrough
- 2Scope & Quote
- 3Onboarding
- 4Service
- 5Supervisor QA
- 6Review & Improve
Onboarding. Floor types & finish age, traffic map, escalation tree.
QA. Photo logs, pH checks, corrective actions tracked.
Reviews. Finish longevity & pad/chemistry optimization.
Visibility
Reporting & communication
- Service logs with zones & timestamps
- Photo logs for edges/entries and corrective actions
- Issue tracker with SLA timers
- Summary: sq ft stripped, coats applied, cure notes
- Single point of contact + supervisor contact
- Maintenance plan (burnish/auto-scrub schedule)
Options
Service tiers
- Top scrub to remove scuffs & soil
- 2–3 coats high-solids finish
- Monthly burnish option
- Full chemical strip to bare floor
- Neutralize & rinse, 3–4 coats finish
- Edge/corner detail and entry focus
Fresh finish, longer-lasting shine.
Send floor type (VCT/LVT/vinyl), approximate square footage, and access windows—tailored proposal in 24–48h.