Specialty

Post-Construction Detailing

Rough, final, and turnover cleans for renovation and build projects. HEPA dust control, sticker/adhesive and paint‑speck removal, interior glass and millwork detail, and floor protection removal—delivered safely with silica controls.

Why Us

Why GCs and PMs pick us

  • Rough → Final → Turnover sequencing with checklists
  • HEPA vacs, dust containment, and negative‑air options
  • Sticker/adhesive, paint speck, and film removal
  • Consistent crews + Supervisor audits and access controls
Outcomes

Typical results

24–48
Proposal
turnaround
95
Dust capture
target
0
Rework days
after turnover
Fit

Spaces we support

Tenant build‑outs, retail fit‑outs, clinic/office renovations, common‑area refreshes, and light industrial interiors.

Deliverables

Scope of work

  • Rough clean: debris pull, HEPA vacuum, major dust knock‑down
  • Adhesive/film/sticker removal; paint speck/silicone edge tidy
  • Interior glass and frame detail; hardware and fixtures
  • Floor protection pull; sweep/vac and damp/machine pass
  • Baseboards, millwork, ledges, vents—detail and wipe‑down
  • Final clean & punch‑list with deficiency notes/photos

Exclusions: construction waste hauling beyond site bins, damaged substrate repair, exterior façade cleaning. We can coordinate partners for glazing scratch removal or specialty coatings.

Compliance

Protocols & safety

  • Silica‑aware controls: wet methods, HEPA tools, containment
  • SDS on site; PPE; ladder/lift training; lock‑out/tag‑out as needed
  • Site orientation & permits respected; egress kept clear
  • WSIB coverage & $5M liability insurance (certificates)
  • Photo documentation of protected surfaces before work

We coordinate with trades to avoid re‑dusting; negative air and zone isolation available where required.

Scheduling

Scheduling & frequency

  • Phase‑aligned to your site schedule (rough/final/turnover)
  • After‑hours and weekend blocks to hit turnover dates
  • Emergency call‑outs with defined response windows
  • Rotation detailing for staged openings
Method

Program flow

  1. 1Walkthrough
  2. 2Scope & Quote
  3. 3Onboarding
  4. 4Service
  5. 5Supervisor QA
  6. 6Review & Improve
Onboarding. Floor counts, protection map, access, escalation tree.
QA. Photo logs, punch‑list tracker, corrective actions.
Reviews. Turnover readiness checks and deficiency close‑outs.
Visibility

Reporting & communication

  • Service logs with zones/floors & timestamps
  • Photo logs for deficiencies and corrective actions
  • Issue tracker with SLA timers
  • Summary: sq ft serviced, passes completed, protection removed
  • Single point of contact + supervisor contact
  • Close‑out report upon turnover
Options

Service tiers

  • Debris pull, HEPA vac, first dust knock‑down
  • Protection touch‑ups; rough glass/millwork wipe
  • Zone containment as required
  • All Rough features
  • Sticker/film removal; paint‑speck tidy
  • Floor machine pass; fixtures & hardware detail
  • All Final features
  • Punch‑list close‑out + photo documentation
  • Post‑handover touch‑up window

Dust‑free handover, on schedule.

Send project square footage, floor count, turnover date, and GC/PM contact—tailored proposal in 24–48h.