Why Us
Why GCs and PMs pick us
- Rough → Final → Turnover sequencing with checklists
- HEPA vacs, dust containment, and negative‑air options
- Sticker/adhesive, paint speck, and film removal
- Consistent crews + Supervisor audits and access controls
Outcomes
Typical results
24–48
Proposal
turnaround
turnaround
95
Dust capture
target
target
0
Rework days
after turnover
after turnover
Fit
Spaces we support
Tenant build‑outs, retail fit‑outs, clinic/office renovations, common‑area refreshes, and light industrial interiors.
Deliverables
Scope of work
- Rough clean: debris pull, HEPA vacuum, major dust knock‑down
- Adhesive/film/sticker removal; paint speck/silicone edge tidy
- Interior glass and frame detail; hardware and fixtures
- Floor protection pull; sweep/vac and damp/machine pass
- Baseboards, millwork, ledges, vents—detail and wipe‑down
- Final clean & punch‑list with deficiency notes/photos
Exclusions: construction waste hauling beyond site bins, damaged substrate repair, exterior façade cleaning. We can coordinate partners for glazing scratch removal or specialty coatings.
Compliance
Protocols & safety
- Silica‑aware controls: wet methods, HEPA tools, containment
- SDS on site; PPE; ladder/lift training; lock‑out/tag‑out as needed
- Site orientation & permits respected; egress kept clear
- WSIB coverage & $5M liability insurance (certificates)
- Photo documentation of protected surfaces before work
We coordinate with trades to avoid re‑dusting; negative air and zone isolation available where required.
Scheduling
Scheduling & frequency
- Phase‑aligned to your site schedule (rough/final/turnover)
- After‑hours and weekend blocks to hit turnover dates
- Emergency call‑outs with defined response windows
- Rotation detailing for staged openings
Method
Program flow
- 1Walkthrough
- 2Scope & Quote
- 3Onboarding
- 4Service
- 5Supervisor QA
- 6Review & Improve
Onboarding. Floor counts, protection map, access, escalation tree.
QA. Photo logs, punch‑list tracker, corrective actions.
Reviews. Turnover readiness checks and deficiency close‑outs.
Visibility
Reporting & communication
- Service logs with zones/floors & timestamps
- Photo logs for deficiencies and corrective actions
- Issue tracker with SLA timers
- Summary: sq ft serviced, passes completed, protection removed
- Single point of contact + supervisor contact
- Close‑out report upon turnover
Options
Service tiers
- Debris pull, HEPA vac, first dust knock‑down
- Protection touch‑ups; rough glass/millwork wipe
- Zone containment as required
- All Rough features
- Sticker/film removal; paint‑speck tidy
- Floor machine pass; fixtures & hardware detail
- All Final features
- Punch‑list close‑out + photo documentation
- Post‑handover touch‑up window
Dust‑free handover, on schedule.
Send project square footage, floor count, turnover date, and GC/PM contact—tailored proposal in 24–48h.