Why Us
Why facilities pick us
- IICRC-aligned processes with fiber-safe chemistry
- Traffic lane pre-treat and agitation for soil suspension
- HWE (extraction) or low-moisture encap based on need
- Consistent crews + Supervisor audits and access controls
Outcomes
Typical results
30–60
Soil load
reduction
reduction
2–6
Dry time
(encap/HWE)
(encap/HWE)
80–95
Stain
improvement
improvement
Fit
Carpets we support
Commercial broadloom & carpet tile in offices, schools, clinics, retail, and common areas. Wool blends on request (test first).
Deliverables
Scope of work
- Pre-vacuum (HEPA) and spot/stain identification
- Pre-spray & agitation (CRB or brush) in traffic lanes
- Method: HWE extraction or low-moisture encapsulation
- Edge/detail passes and wick-back mitigation
- Post-grooming for pile set; air movers as needed
- Final walk-through and dry-time guidance
Exclusions: flood restoration, pad replacement, dye/bleach spot color repair. Delicate fibers and wool processed only with prior test and approval.
Compliance
Protocols & safety
- IICRC S100 informed; SDS on site; PPE
- Low-residue detergents to reduce re-soiling
- Slip-hazard cones & cable management
- WSIB coverage & liability insurance (certificates)
- Noise/timing controls for occupied spaces
We select chemistry to match fiber type and backing to avoid delamination or dye transfer.
Scheduling
Scheduling & frequency
- Quarterly or semi-annual for traffic lanes
- Night work to meet dry-by-morning targets
- Emergency stain call-outs
- Rotation plan for multi-floor portfolios
Method
Program flow
- 1Walkthrough
- 2Scope & Quote
- 3Onboarding
- 4Service
- 5Supervisor QA
- 6Review & Improve
Onboarding. Fiber/backing check, traffic map, access, escalation tree.
QA. Photo logs, stain log, corrective actions tracked.
Reviews. Appearance retention & method optimization by zone.
Visibility
Reporting & communication
- Service logs with zones & timestamps
- Before/after photos and stain log updates
- Issue tracker with SLA timers
- Summary: sq ft cleaned, method used, dry times
- Single point of contact + supervisor contact
- Maintenance plan (traffic lane schedule)
Options
Service tiers
- Low-moisture encapsulation in traffic lanes
- Fast dry times (2–4h typical)
- Monthly/quarterly rotation
- Hot water extraction for deep soil removal
- Pre-treat + agitation; targeted stain work
- Air movers to speed dry time
- All Extraction features
- Dual-method (encap + HWE) on heavy lanes
- Deodorizer/oxidizer add-ons where appropriate
Cleaner carpets, faster turnaround.
Send approximate square footage, fiber type (if known), traffic zones, and access notes—tailored proposal in 24–48h.