Construction

Post‑Construction

Turnover‑ready, phased cleans. HEPA dust control, sticker & glue removal, glass & frames, fixtures, and floor care—scheduled around trades with Supervisor QA and safety at the core.

Why Us

Why GCs pick us

  • Silica‑aware HEPA dust control; ceiling‑to‑floor sequencing
  • Sticker/film & adhesive removal on glass and fixtures
  • Floor care: machine scrub, neutralize, rinse; protection lift
  • Consistent teams + Supervisor audits and access controls
Outcomes

Typical results

24–48
Proposal
turnaround
99
Punch‑list
closure target
≤2
Final clean
booking lead
Fit

Footprints we support

Retail build‑outs, tenant improvements, office fit‑outs, restaurants, showrooms, schools, light industrial.

Deliverables

Scope of work

  • Rough/Initial: debris bag‑out, sweep, HEPA vac, edge detail
  • Glass & frames: sticker film removal; mullions & hardware
  • Fixtures & millwork: wipe‑down, polish, adhesive residue
  • Floors: machine scrub/neutralize; grout/slurry pickup
  • Washrooms & back‑of‑house: full service
  • Final: touch‑up pass for client walk & deficiencies

Add‑ons on request: waste bin service & dump runs, floor protection remove/haul, high dust (lift‑accessible), exterior entry wash.

Compliance

Protocols & safety

  • WHMIS‑aligned; SDS on site; PPE (N95/respirators as needed)
  • Silica‑aware methods; dust suppression & controlled vac
  • Lift‑certified staff (where applicable); site orientation
  • Security: key control, access logs, contractor protocols
  • WSIB coverage & liability insurance (certificates available)

Work sequenced around trades; no open‑cutting or energized areas by our crews.

Scheduling

Scheduling & frequency

  • Phased: rough → initial → final → turnover touch‑ups
  • Day, evening, or overnight blocks to hit handover dates
  • Emergency call‑outs with defined response windows
  • Deficiency punch‑list support pre‑handover
Method

Program flow

  1. 1Walkthrough
  2. 2Scope & Quote
  3. 3Rough/Initial
  4. 4Final Clean
  5. 5Punch‑List
  6. 6Turnover
Onboarding. Site file, access, lift plans, escalation tree.
QA. Photo logs, corrective actions tracked.
Turnover. Final pass timed to client walkthrough.
Visibility

Reporting & communication

  • Service logs with completed tasks & timestamps
  • Photo logs for detailing and corrective actions
  • Punch‑list tracker with SLA timers
  • Handover summary: metrics, deficiencies, sign‑off
  • Single point of contact + supervisor contact
  • Bin tickets/dump receipts where applicable
Options

Service tiers

  • Debris bag‑out; broom sweep & magnet sweep (if req.)
  • HEPA vac of horizontals, edges, and services
  • Glass sticker/film pull where safe
  • All Rough features
  • Interior glass & mullions; fixture & millwork detail
  • Machine scrub floors; neutralize & rinse
  • All Initial features
  • Final touch‑up & deficiency support
  • Turnover‑timed walkthrough assistance

Turnover‑ready, on schedule.

Send square footage, floors/levels, and target handover date—tailored proposal in 24–48h.